US Bridges

Marion CO Rt 19/2 over Pharaoh Run

Good

Marion County, West Virginia · 0.04 MI East U.S. Rt 19 · Structure no. 00000000025A228

Built
1997
28 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
32 ft
1 main span
Daily traffic
90
2022 count
Owner
State
State Highway Agency

About this bridge

Marion CO Rt 19/2 over Pharaoh Run is a prestressed concrete box beam or girders - multiple carrying Marion CO Rt 19/2 over Pharaoh Run in Marion County, West Virginia. It was built in 1997, so it is 28 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 90 vehicles a day, projected to reach 140 by 2041. The structure is 32 ft (9.7 m) long and 18 ft wide.

CarriesMarion CO Rt 19/2
CrossesPharaoh Run
Location0.04 MI East U.S. Rt 19
RouteCounty Highway 1902
Coordinates39.55325, -80.11891
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating86 US tons
Inventory rating52 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length32 ft (9.7 m)
Longest span26 ft (7.9 m)
Deck width18 ft (5.5 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2022)
Projected traffic140 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Marion CO Rt 19/2 over Pharaoh Run built?

It was built in 1997, making it 28 years old in 2025.

What condition is Marion CO Rt 19/2 over Pharaoh Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Marion CO Rt 19/2 over Pharaoh Run carry?

About 90 vehicles per day (2022 count).

How long is Marion CO Rt 19/2 over Pharaoh Run?

The structure is 32 ft (9.7 m) long with a longest span of 26 ft (7.9 m) and a deck 18 ft wide.

Who owns Marion CO Rt 19/2 over Pharaoh Run?

It is owned by the State Highway Agency.