Marion CR 250/12 over Davy Run
FairMarion County, West Virginia · 0.37 MI South CR 250/48 · Structure no. 00000000025A180
- Built
- 1949
- 76 years old
- Condition
- Fair
- inspected January 2023
- Type
- Channel Beam
- Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 550
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Marion CR 250/12 over Davy Run is a concrete channel beam carrying Marion CR 250/12 over Davy Run in Marion County, West Virginia. It was built in 1949, so it is 76 years old, older than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 550 vehicles a day, roughly 8% of them trucks, projected to reach 860 by 2041. The structure is 28 ft (8.5 m) long and 24 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Marion CR 250/12 over Davy Run built?
It was built in 1949, making it 76 years old in 2025.
What condition is Marion CR 250/12 over Davy Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Marion CR 250/12 over Davy Run carry?
About 550 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is Marion CR 250/12 over Davy Run?
The structure is 28 ft (8.5 m) long with a longest span of 23 ft (7 m) and a deck 24 ft wide.
Who owns Marion CR 250/12 over Davy Run?
It is owned by the State Highway Agency.