US Bridges

Marion CO Rt 1/5 over Warrior Fork

Good

Marion County, West Virginia · 0.01 MI North CO Rt 1/3 · Structure no. 00000000025A006

Built
1991
34 years old
Condition
Good
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
30 ft
1 main span
Daily traffic
10
2022 count
Owner
State
State Highway Agency

About this bridge

Marion CO Rt 1/5 over Warrior Fork is a prestressed concrete box beam or girders - multiple carrying Marion CO Rt 1/5 over Warrior Fork in Marion County, West Virginia. It was built in 1991, so it is 34 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, projected to reach 16 by 2041. The structure is 30 ft (9.1 m) long and 18 ft wide.

CarriesMarion CO Rt 1/5
CrossesWarrior Fork
Location0.01 MI North CO Rt 1/3
RouteCounty Highway 105
Coordinates39.55856, -80.45859
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating98 US tons
Inventory rating65 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length30 ft (9.1 m)
Longest span26 ft (7.9 m)
Deck width18 ft (5.5 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2022)
Projected traffic16 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Marion CO Rt 1/5 over Warrior Fork built?

It was built in 1991, making it 34 years old in 2025.

What condition is Marion CO Rt 1/5 over Warrior Fork in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Marion CO Rt 1/5 over Warrior Fork carry?

About 10 vehicles per day (2022 count).

How long is Marion CO Rt 1/5 over Warrior Fork?

The structure is 30 ft (9.1 m) long with a longest span of 26 ft (7.9 m) and a deck 18 ft wide.

Who owns Marion CO Rt 1/5 over Warrior Fork?

It is owned by the State Highway Agency.