US Bridges

CO 17/13 over North Fork

Fair

McDowell County, West Virginia · 0.11 MI West of CO 17 · Structure no. 00000000024A299

Built
2001
24 years old
Condition
Fair
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
51 ft
1 main span
Daily traffic
200
2022 count
Owner
State
State Highway Agency

About this bridge

CO 17/13 over North Fork is a prestressed concrete box beam or girders - multiple carrying CO 17/13 over North Fork in McDowell County, West Virginia. It was built in 2001, so it is 24 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 200 vehicles a day, roughly 9% of them trucks, projected to reach 210 by 2042. The structure is 51 ft (15.4 m) long and 15 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCO 17/13
CrossesNorth Fork
Location0.11 MI West of CO 17
RouteCounty Highway 1713
Coordinates37.41546, -81.42924
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating87 US tons
Inventory rating52 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length51 ft (15.4 m)
Longest span46 ft (14 m)
Deck width15 ft (4.6 m)
Roadway width15 ft (4.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic210 by 2042
Trucks9%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$550,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was CO 17/13 over North Fork built?

It was built in 2001, making it 24 years old in 2025.

What condition is CO 17/13 over North Fork in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does CO 17/13 over North Fork carry?

About 200 vehicles per day (2022 count), of which roughly 9% are trucks.

How long is CO 17/13 over North Fork?

The structure is 51 ft (15.4 m) long with a longest span of 46 ft (14 m) and a deck 15 ft wide.

Who owns CO 17/13 over North Fork?

It is owned by the State Highway Agency.