CO 9/5 Sls over Furnace Run
FairJefferson County, West Virginia · 0.13 MI S of CR 9/4 Sls · Structure no. 00000000019A036
- Built
- 1998
- 27 years old
- Condition
- Fair
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 57 ft
- 1 main span
- Daily traffic
- 5,100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
CO 9/5 Sls over Furnace Run is a prestressed concrete box beam or girders - multiple carrying CO 9/5 Sls over Furnace Run in Jefferson County, West Virginia. It was built in 1998, so it is 27 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,100 vehicles a day, roughly 5% of them trucks, projected to reach 9,078 by 2042. The structure is 57 ft (17.5 m) long and 27 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO 9/5 Sls over Furnace Run built?
It was built in 1998, making it 27 years old in 2025.
What condition is CO 9/5 Sls over Furnace Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does CO 9/5 Sls over Furnace Run carry?
About 5,100 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is CO 9/5 Sls over Furnace Run?
The structure is 57 ft (17.5 m) long with a longest span of 52 ft (15.9 m) and a deck 27 ft wide.
Who owns CO 9/5 Sls over Furnace Run?
It is owned by the State Highway Agency.