County Route 7 over Left Fork Sandy Creek
GoodJackson County, West Virginia · 0.12 Mile East of CR 21 · Structure no. 00000000018A232
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 159 ft
- 1 main span
- Daily traffic
- 700
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 7 over Left Fork Sandy Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying County Route 7 over Left Fork Sandy Creek in Jackson County, West Virginia. It was built in 2006, so it is 19 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 700 vehicles a day, roughly 6% of them trucks, projected to reach 1,015 by 2042. The structure is 159 ft (48.6 m) long and 31 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 7 over Left Fork Sandy Creek built?
It was built in 2006, making it 19 years old in 2025.
What condition is County Route 7 over Left Fork Sandy Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does County Route 7 over Left Fork Sandy Creek carry?
About 700 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is County Route 7 over Left Fork Sandy Creek?
The structure is 159 ft (48.6 m) long with a longest span of 50 ft (15.2 m) and a deck 31 ft wide.
Who owns County Route 7 over Left Fork Sandy Creek?
It is owned by the State Highway Agency.