US Bridges

Har CO Rt 19/7 over Lambert Run

Good

Harrison County, West Virginia · 0.01 Mi. E. of Rt. 19/37 · Structure no. 00000000017A345

Built
2011
14 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
550
2022 count
Owner
State
State Highway Agency

About this bridge

Har CO Rt 19/7 over Lambert Run is a prestressed concrete box beam or girders - multiple carrying Har CO Rt 19/7 over Lambert Run in Harrison County, West Virginia. It was built in 2011, so it is 14 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 550 vehicles a day, roughly 8% of them trucks, projected to reach 755 by 2041. The structure is 50 ft (15.2 m) long and 22 ft wide.

CarriesHar CO Rt 19/7
CrossesLambert Run
Location0.01 Mi. E. of Rt. 19/37
RouteCounty Highway 197
Coordinates39.34916, -80.3291
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating53 US tons
Inventory rating43 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length50 ft (15.2 m)
Longest span46 ft (14 m)
Deck width22 ft (6.6 m)
Roadway width21 ft (6.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2022)
Projected traffic755 by 2041
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Har CO Rt 19/7 over Lambert Run built?

It was built in 2011, making it 14 years old in 2025.

What condition is Har CO Rt 19/7 over Lambert Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Har CO Rt 19/7 over Lambert Run carry?

About 550 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is Har CO Rt 19/7 over Lambert Run?

The structure is 50 ft (15.2 m) long with a longest span of 46 ft (14 m) and a deck 22 ft wide.

Who owns Har CO Rt 19/7 over Lambert Run?

It is owned by the State Highway Agency.