County Route 2/3 over South Fork Tomlinson Run
GoodHancock County, West Virginia · 0.20 Mi. South JCT WV8 · Structure no. 00000000015A004
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 100
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 2/3 over South Fork Tomlinson Run is a prestressed concrete box beam or girders - multiple carrying County Route 2/3 over South Fork Tomlinson Run in Hancock County, West Virginia. It was built in 1988, so it is 37 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 8% of them trucks, projected to reach 122 by 2039. The structure is 28 ft (8.4 m) long and 15 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 2/3 over South Fork Tomlinson Run built?
It was built in 1988, making it 37 years old in 2025.
What condition is County Route 2/3 over South Fork Tomlinson Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does County Route 2/3 over South Fork Tomlinson Run carry?
About 100 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is County Route 2/3 over South Fork Tomlinson Run?
The structure is 28 ft (8.4 m) long with a longest span of 24 ft (7.3 m) and a deck 15 ft wide.
Who owns County Route 2/3 over South Fork Tomlinson Run?
It is owned by the State Highway Agency.