County Route 10/3 over Horn Camp Run
GoodHampshire County, West Virginia · 0.89 MI S of 10/5 Sls · Structure no. 00000000014A105
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected August 2024
- Type
- Slab
- Concrete
- Length
- 36 ft
- 1 main span
- Daily traffic
- 150
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 10/3 over Horn Camp Run is a concrete slab carrying County Route 10/3 over Horn Camp Run in Hampshire County, West Virginia. It was built in 2006, so it is 19 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 8% of them trucks, projected to reach 258 by 2043. The structure is 36 ft (11.1 m) long and 24 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 10/3 over Horn Camp Run built?
It was built in 2006, making it 19 years old in 2025.
What condition is County Route 10/3 over Horn Camp Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does County Route 10/3 over Horn Camp Run carry?
About 150 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is County Route 10/3 over Horn Camp Run?
The structure is 36 ft (11.1 m) long with a longest span of 31 ft (9.6 m) and a deck 24 ft wide.
Who owns County Route 10/3 over Horn Camp Run?
It is owned by the State Highway Agency.