US Bridges

I-64 Ebl & Wbl over County Route 60/20

Good

Greenbrier County, West Virginia · 1.97 Miles W. of CR 60/14 · Structure no. 00000000013A154

Built
1967
58 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
25 ft
1 main span
Daily traffic
11,079
2019 count
Owner
State
State Highway Agency

About this bridge

I-64 Ebl & Wbl over County Route 60/20 is a concrete culvert carrying I-64 Ebl & Wbl over County Route 60/20 in Greenbrier County, West Virginia. It was built in 1967, so it is 58 years old, older than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,079 vehicles a day, roughly 28% of them trucks, projected to reach 16,065 by 2039. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 8.1 mi (13 km).

CarriesI-64 Ebl & Wbl
CrossesCounty Route 60/20
Location1.97 Miles W. of CR 60/14
RouteInterstate 6400
Coordinates37.78226, -80.38187
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length25 ft (7.6 m)
Longest span22 ft (6.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,079 (2019)
Projected traffic16,065 by 2039
Trucks28%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of relocation of road
Estimated improvement cost$1.2 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-64 Ebl & Wbl over County Route 60/20 built?

It was built in 1967, making it 58 years old in 2025.

What condition is I-64 Ebl & Wbl over County Route 60/20 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does I-64 Ebl & Wbl over County Route 60/20 carry?

About 11,079 vehicles per day (2019 count), of which roughly 28% are trucks.

How long is I-64 Ebl & Wbl over County Route 60/20?

The structure is 25 ft (7.6 m) long with a longest span of 22 ft (6.7 m).

Who owns I-64 Ebl & Wbl over County Route 60/20?

It is owned by the State Highway Agency.