County Route 1/2 over Big Clear Creek
FairPosted for loadGreenbrier County, West Virginia · 0.02 Miles E. of CR 1 · Structure no. 00000000013A007
- Built
- 1966
- 59 years old
- Condition
- Fair
- inspected April 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 78 ft
- 1 main span
- Daily traffic
- 21
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 1/2 over Big Clear Creek is a steel girder and floorbeam system carrying County Route 1/2 over Big Clear Creek in Greenbrier County, West Virginia. It was built in 1966, so it is 59 years old, older than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 21 vehicles a day, roughly 10% of them trucks, projected to reach 27 by 2039. The structure is 78 ft (23.7 m) long and 14 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 1/2 over Big Clear Creek built?
It was built in 1966, making it 59 years old in 2025.
What condition is County Route 1/2 over Big Clear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does County Route 1/2 over Big Clear Creek carry?
About 21 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is County Route 1/2 over Big Clear Creek?
The structure is 78 ft (23.7 m) long with a longest span of 73 ft (22.3 m) and a deck 14 ft wide.
Who owns County Route 1/2 over Big Clear Creek?
It is owned by the State Highway Agency.