County Route 9/4 over Right Fk. of Steer Creek
GoodBraxton County, West Virginia · 0.03MI. S. of Co. 9 · Structure no. 00000000004A165
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 43 ft
- 1 main span
- Daily traffic
- 100
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 9/4 over Right Fk. of Steer Creek is a wood or timber stringer/multi-beam or girder carrying County Route 9/4 over Right Fk. of Steer Creek in Braxton County, West Virginia. It was built in 1998, so it is 27 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 6% of them trucks, projected to reach 140 by 2038. The structure is 43 ft (13.1 m) long and 17 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 9/4 over Right Fk. of Steer Creek built?
It was built in 1998, making it 27 years old in 2025.
What condition is County Route 9/4 over Right Fk. of Steer Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does County Route 9/4 over Right Fk. of Steer Creek carry?
About 100 vehicles per day (2018 count), of which roughly 6% are trucks.
How long is County Route 9/4 over Right Fk. of Steer Creek?
The structure is 43 ft (13.1 m) long with a longest span of 39 ft (12 m) and a deck 17 ft wide.
Who owns County Route 9/4 over Right Fk. of Steer Creek?
It is owned by the State Highway Agency.