US Bridges

Route 3/2 over Tony Creek

Fair

Boone County, West Virginia · 1.50 Miles N of Wv Rt 3 · Structure no. 00000000003A195

Built
2014
11 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
30 ft
1 main span
Daily traffic
550
2022 count
Owner
State
State Highway Agency

About this bridge

Route 3/2 over Tony Creek is a steel stringer/multi-beam or girder carrying Route 3/2 over Tony Creek in Boone County, West Virginia. It was built in 2014, so it is 11 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 550 vehicles a day, roughly 8% of them trucks, projected to reach 726 by 2042. The structure is 30 ft (9.1 m) long and 15 ft wide.

CarriesRoute 3/2
CrossesTony Creek
Location1.50 Miles N of Wv Rt 3
RouteCounty Highway 32
Coordinates38.15922, -81.61968
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98 US tons
Inventory rating71 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length30 ft (9.1 m)
Longest span29 ft (8.7 m)
Deck width15 ft (4.6 m)
Roadway width15 ft (4.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2022)
Projected traffic726 by 2042
Trucks8%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 3/2 over Tony Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is Route 3/2 over Tony Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Route 3/2 over Tony Creek carry?

About 550 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is Route 3/2 over Tony Creek?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.7 m) and a deck 15 ft wide.

Who owns Route 3/2 over Tony Creek?

It is owned by the State Highway Agency.