US Bridges

CR 9/30 Sls over CSX Transport System

Good

Berkeley County, West Virginia · 0.23 Mile East of Wv 09 F · Structure no. 00000000002A168

Built
2013
12 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
161 ft
1 main span
Daily traffic
3,900
2020 count
Owner
State
State Highway Agency

About this bridge

CR 9/30 Sls over CSX Transport System is a steel stringer/multi-beam or girder carrying CR 9/30 Sls over CSX Transport System in Berkeley County, West Virginia. It was built in 2013, so it is 12 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,900 vehicles a day, roughly 2% of them trucks, projected to reach 6,513 by 2040. The structure is 161 ft (49.1 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCR 9/30 Sls
CrossesCSX Transport System
Location0.23 Mile East of Wv 09 F
RouteCounty Highway 930
Coordinates39.50625, -77.96427
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48.9 US tons
Inventory rating38 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length161 ft (49.1 m)
Longest span159 ft (48.5 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,900 (2020)
Projected traffic6,513 by 2040
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 9/30 Sls over CSX Transport System built?

It was built in 2013, making it 12 years old in 2025.

What condition is CR 9/30 Sls over CSX Transport System in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does CR 9/30 Sls over CSX Transport System carry?

About 3,900 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is CR 9/30 Sls over CSX Transport System?

The structure is 161 ft (49.1 m) long with a longest span of 159 ft (48.5 m) and a deck 42 ft wide.

Who owns CR 9/30 Sls over CSX Transport System?

It is owned by the State Highway Agency.