Lrd Arpin-Sherry R over E Fk Hemlock Creek
GoodWood County, Wisconsin · 1.2M N JCT Cth Hh · Structure no. B71009100000000
- Built
- 1994
- 31 years old
- Condition
- Good
- inspected June 2024
- Type
- Slab
- Concrete
- Length
- 36 ft
- 1 main span
- Daily traffic
- 50
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Arpin-Sherry R over E Fk Hemlock Creek is a concrete slab carrying Lrd Arpin-Sherry R over E Fk Hemlock Creek in Wood County, Wisconsin. It was built in 1994, so it is 31 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 55 by 2043. The structure is 36 ft (10.9 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Arpin-Sherry R over E Fk Hemlock Creek built?
It was built in 1994, making it 31 years old in 2025.
What condition is Lrd Arpin-Sherry R over E Fk Hemlock Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Lrd Arpin-Sherry R over E Fk Hemlock Creek carry?
About 50 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is Lrd Arpin-Sherry R over E Fk Hemlock Creek?
The structure is 36 ft (10.9 m) long with a longest span of 34 ft (10.4 m) and a deck 26 ft wide.
Who owns Lrd Arpin-Sherry R over E Fk Hemlock Creek?
It is owned by the Town or Township Highway Agency.