US Bridges

Lrd Robin RD over E Br Yellow River

Good

Wood County, Wisconsin · 0.1M N JCT Cth H · Structure no. B71004900000000

Built
1984
41 years old
Condition
Good
inspected September 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
70
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Robin RD over E Br Yellow River is a prestressed concrete stringer/multi-beam or girder carrying Lrd Robin RD over E Br Yellow River in Wood County, Wisconsin. It was built in 1984, so it is 41 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 70 vehicles a day, projected to reach 77 by 2041. The structure is 55 ft (16.8 m) long and 26 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesLrd Robin RD
CrossesE Br Yellow River
Location0.1M N JCT Cth H
RouteCity Street 0
Coordinates44.65728, -90.23861
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating34 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length55 ft (16.8 m)
Longest span53 ft (16.2 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic70 (2022)
Projected traffic77 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Robin RD over E Br Yellow River built?

It was built in 1984, making it 41 years old in 2025.

What condition is Lrd Robin RD over E Br Yellow River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.

How much traffic does Lrd Robin RD over E Br Yellow River carry?

About 70 vehicles per day (2022 count).

How long is Lrd Robin RD over E Br Yellow River?

The structure is 55 ft (16.8 m) long with a longest span of 53 ft (16.2 m) and a deck 26 ft wide.

Who owns Lrd Robin RD over E Br Yellow River?

It is owned by the Town or Township Highway Agency.