IH Ush 45 to IH 41 over IH Ush 45 SB to IH 41SB
GoodWinnebago County, Wisconsin · Tbd · Structure no. B70027100000000
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected September 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 181 ft
- 3 main spans
- Daily traffic
- 7,700
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH Ush 45 to IH 41 over IH Ush 45 SB to IH 41SB is a prestressed concrete continuous stringer/multi-beam or girder carrying IH Ush 45 to IH 41 over IH Ush 45 SB to IH 41SB in Winnebago County, Wisconsin. It was built in 2010, so it is 15 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,700 vehicles a day, projected to reach 13,200 by 2041. The structure is 181 ft (55.2 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH Ush 45 to IH 41 over IH Ush 45 SB to IH 41SB built?
It was built in 2010, making it 15 years old in 2025.
What condition is IH Ush 45 to IH 41 over IH Ush 45 SB to IH 41SB in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.
How much traffic does IH Ush 45 to IH 41 over IH Ush 45 SB to IH 41SB carry?
About 7,700 vehicles per day (2022 count).
How long is IH Ush 45 to IH 41 over IH Ush 45 SB to IH 41SB?
The structure is 181 ft (55.2 m) long with a longest span of 66 ft (20.1 m) and a deck 31 ft wide.
Who owns IH Ush 45 to IH 41 over IH Ush 45 SB to IH 41SB?
It is owned by the State Highway Agency.