US Bridges

Cth E (witzel Ave over IH 41

Good

Winnebago County, Wisconsin · At Ush 41 · Structure no. B70025700000000

Built
2010
15 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
171 ft
2 main spans
Daily traffic
16,400
2023 count
Owner
State
State Highway Agency

About this bridge

Cth E (witzel Ave over IH 41 is a concrete continuous stringer/multi-beam or girder carrying Cth E (witzel Ave over IH 41 in Winnebago County, Wisconsin. It was built in 2010, so it is 15 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,400 vehicles a day, projected to reach 25,700 by 2042. The structure is 171 ft (52.1 m) long and 77 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCth E (witzel Ave
CrossesIH 41
LocationAt Ush 41
RouteCounty Highway 0E
Coordinates44.01802, -88.58238
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.7 US tons
Inventory rating42.1 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length171 ft (52.1 m)
Longest span84 ft (25.5 m)
Deck width77 ft (23.5 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,400 (2023)
Projected traffic25,700 by 2042
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cth E (witzel Ave over IH 41 built?

It was built in 2010, making it 15 years old in 2025.

What condition is Cth E (witzel Ave over IH 41 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Cth E (witzel Ave over IH 41 carry?

About 16,400 vehicles per day (2023 count).

How long is Cth E (witzel Ave over IH 41?

The structure is 171 ft (52.1 m) long with a longest span of 84 ft (25.5 m) and a deck 77 ft wide.

Who owns Cth E (witzel Ave over IH 41?

It is owned by the State Highway Agency.