Sth 114-WINNECONNE over Neenah Slough
GoodWinnebago County, Wisconsin · 0.3M E JCT Ush 41 to N · Structure no. B70017300000000
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 22,500
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Sth 114-WINNECONNE over Neenah Slough is a prestressed concrete stringer/multi-beam or girder carrying Sth 114-WINNECONNE over Neenah Slough in Winnebago County, Wisconsin. It was built in 1997, so it is 28 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,500 vehicles a day, roughly 3% of them trucks, projected to reach 22,445 by 2043. The structure is 52 ft (16 m) long and 71 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 114-WINNECONNE over Neenah Slough built?
It was built in 1997, making it 28 years old in 2025.
What condition is Sth 114-WINNECONNE over Neenah Slough in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Sth 114-WINNECONNE over Neenah Slough carry?
About 22,500 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Sth 114-WINNECONNE over Neenah Slough?
The structure is 52 ft (16 m) long with a longest span of 50 ft (15.2 m) and a deck 71 ft wide.
Who owns Sth 114-WINNECONNE over Neenah Slough?
It is owned by the City or Municipal Highway Agency.