IH 41 NB over Soo Line
GoodWinnebago County, Wisconsin · 4.8M N JCT Ush 45 to N · Structure no. B70007100000000
- Built
- 1975
- 50 years old, rebuilt 2010
- Condition
- Good
- inspected June 2023
- Type
- Slab
- Concrete Continuous
- Length
- 121 ft
- 3 main spans
- Daily traffic
- 39,350
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 41 NB over Soo Line is a concrete continuous slab carrying IH 41 NB over Soo Line in Winnebago County, Wisconsin. It was built in 1975 and reconstructed in 2010, so it is 50 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 39,350 vehicles a day, roughly 18% of them trucks, projected to reach 57,750 by 2042. The structure is 121 ft (37 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 41 NB over Soo Line built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2010.
What condition is IH 41 NB over Soo Line in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does IH 41 NB over Soo Line carry?
About 39,350 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is IH 41 NB over Soo Line?
The structure is 121 ft (37 m) long with a longest span of 49 ft (14.9 m) and a deck 63 ft wide.
Who owns IH 41 NB over Soo Line?
It is owned by the State Highway Agency.