Lrd Enterprise Ave over Poplar Creek
GoodWaukesha County, Wisconsin · 0.3 MI W JCT Cth Y · Structure no. B67039700000000
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected November 2024
- Type
- Slab
- Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 520
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Lrd Enterprise Ave over Poplar Creek is a concrete slab carrying Lrd Enterprise Ave over Poplar Creek in Waukesha County, Wisconsin. It was built in 2024, so it is 1 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 520 vehicles a day, roughly 20% of them trucks, projected to reach 580 by 2044. The structure is 51 ft (15.4 m) long and 51 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Enterprise Ave over Poplar Creek built?
It was built in 2024, making it 1 years old in 2025.
What condition is Lrd Enterprise Ave over Poplar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Lrd Enterprise Ave over Poplar Creek carry?
About 520 vehicles per day (2024 count), of which roughly 20% are trucks.
How long is Lrd Enterprise Ave over Poplar Creek?
The structure is 51 ft (15.4 m) long with a longest span of 48 ft (14.6 m) and a deck 51 ft wide.
Who owns Lrd Enterprise Ave over Poplar Creek?
It is owned by the City or Municipal Highway Agency.