US Bridges

Lrd Enterprise Ave over Poplar Creek

Good

Waukesha County, Wisconsin · 0.3 MI W JCT Cth Y · Structure no. B67039700000000

Built
2024
1 years old
Condition
Good
inspected November 2024
Type
Slab
Concrete
Length
51 ft
1 main span
Daily traffic
520
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Enterprise Ave over Poplar Creek is a concrete slab carrying Lrd Enterprise Ave over Poplar Creek in Waukesha County, Wisconsin. It was built in 2024, so it is 1 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 520 vehicles a day, roughly 20% of them trucks, projected to reach 580 by 2044. The structure is 51 ft (15.4 m) long and 51 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesLrd Enterprise Ave
CrossesPoplar Creek
Location0.3 MI W JCT Cth Y
RouteCity Street 0
Coordinates43.05259, -88.17149
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating45.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length51 ft (15.4 m)
Longest span48 ft (14.6 m)
Deck width51 ft (15.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic520 (2024)
Projected traffic580 by 2044
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Enterprise Ave over Poplar Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Lrd Enterprise Ave over Poplar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Lrd Enterprise Ave over Poplar Creek carry?

About 520 vehicles per day (2024 count), of which roughly 20% are trucks.

How long is Lrd Enterprise Ave over Poplar Creek?

The structure is 51 ft (15.4 m) long with a longest span of 48 ft (14.6 m) and a deck 51 ft wide.

Who owns Lrd Enterprise Ave over Poplar Creek?

It is owned by the City or Municipal Highway Agency.