US Bridges

Lrd Clearwater DR over Underwood Creek

Good

Waukesha County, Wisconsin · 1.4M S JCT Sth 190 · Structure no. B67032800000000

Built
2008
17 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
35 ft
3 main spans
Daily traffic
150
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Clearwater DR over Underwood Creek is a concrete culvert carrying Lrd Clearwater DR over Underwood Creek in Waukesha County, Wisconsin. It was built in 2008, so it is 17 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, projected to reach 151 by 2043. The structure is 35 ft (10.7 m) long and 40 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesLrd Clearwater DR
CrossesUnderwood Creek
Location1.4M S JCT Sth 190
RouteCity Street 0
Coordinates43.06983, -88.09545
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length35 ft (10.7 m)
Longest span10 ft (3 m)
Deck width40 ft (12.2 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2022)
Projected traffic151 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Clearwater DR over Underwood Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is Lrd Clearwater DR over Underwood Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Lrd Clearwater DR over Underwood Creek carry?

About 150 vehicles per day (2022 count).

How long is Lrd Clearwater DR over Underwood Creek?

The structure is 35 ft (10.7 m) long with a longest span of 10 ft (3 m) and a deck 40 ft wide.

Who owns Lrd Clearwater DR over Underwood Creek?

It is owned by the City or Municipal Highway Agency.