US Bridges

Cth C (lakeland DR over Cp Rail

Fair

Waukesha County, Wisconsin · 0.2M S JCT Sth 16 · Structure no. B67019000000000

Built
1977
48 years old
Condition
Fair
inspected December 2024
Type
Slab
Concrete Continuous
Length
127 ft
3 main spans
Daily traffic
6,900
2022 count
Owner
County
County Highway Agency

About this bridge

Cth C (lakeland DR over Cp Rail is a concrete continuous slab carrying Cth C (lakeland DR over Cp Rail in Waukesha County, Wisconsin. It was built in 1977, so it is 48 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,900 vehicles a day, projected to reach 8,280 by 2042. The structure is 127 ft (38.6 m) long and 44 ft wide. If it were closed, the detour would be 10.6 mi (17 km).

CarriesCth C (lakeland DR
CrossesCp Rail
Location0.2M S JCT Sth 16
RouteCounty Highway 0C
Coordinates43.09845, -88.40296
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating34 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length127 ft (38.6 m)
Longest span56 ft (17.1 m)
Deck width44 ft (13.3 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,900 (2022)
Projected traffic8,280 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed10.6 mi (17 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cth C (lakeland DR over Cp Rail built?

It was built in 1977, making it 48 years old in 2025.

What condition is Cth C (lakeland DR over Cp Rail in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Cth C (lakeland DR over Cp Rail carry?

About 6,900 vehicles per day (2022 count).

How long is Cth C (lakeland DR over Cp Rail?

The structure is 127 ft (38.6 m) long with a longest span of 56 ft (17.1 m) and a deck 44 ft wide.

Who owns Cth C (lakeland DR over Cp Rail?

It is owned by the County Highway Agency.