Cth C (genesee St) over IH 94
PoorWaukesha County, Wisconsin · 2.8M S JCT Cth P · Structure no. B67006400000000
- Built
- 1963
- 62 years old
- Condition
- Poor
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 218 ft
- 4 main spans
- Daily traffic
- 9,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Cth C (genesee St) over IH 94 is a prestressed concrete stringer/multi-beam or girder carrying Cth C (genesee St) over IH 94 in Waukesha County, Wisconsin. It was built in 1963, so it is 62 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 9,000 vehicles a day, projected to reach 10,800 by 2042. The structure is 218 ft (66.4 m) long and 38 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cth C (genesee St) over IH 94 built?
It was built in 1963, making it 62 years old in 2025.
What condition is Cth C (genesee St) over IH 94 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in May 2024.
How much traffic does Cth C (genesee St) over IH 94 carry?
About 9,000 vehicles per day (2022 count).
How long is Cth C (genesee St) over IH 94?
The structure is 218 ft (66.4 m) long with a longest span of 68 ft (20.7 m) and a deck 38 ft wide.
Who owns Cth C (genesee St) over IH 94?
It is owned by the State Highway Agency.