US Bridges

Lrd Davidson Road over Poplar Creek

Good

Waukesha County, Wisconsin · 0.3M E JCT Cth Y · Structure no. B67002000000000

Built
2001
24 years old
Condition
Good
inspected May 2022
Type
Slab
Concrete
Length
43 ft
1 main span
Daily traffic
1,300
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Davidson Road over Poplar Creek is a concrete slab carrying Lrd Davidson Road over Poplar Creek in Waukesha County, Wisconsin. It was built in 2001, so it is 24 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,300 vehicles a day, projected to reach 1,560 by 2042. The structure is 43 ft (13 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd Davidson Road
CrossesPoplar Creek
Location0.3M E JCT Cth Y
RouteCity Street 0
Coordinates43.02463, -88.16148
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.9 US tons
Inventory rating44.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length43 ft (13 m)
Longest span40 ft (12.2 m)
Deck width39 ft (12 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,300 (2022)
Projected traffic1,560 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Davidson Road over Poplar Creek built?

It was built in 2001, making it 24 years old in 2025.

What condition is Lrd Davidson Road over Poplar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does Lrd Davidson Road over Poplar Creek carry?

About 1,300 vehicles per day (2022 count).

How long is Lrd Davidson Road over Poplar Creek?

The structure is 43 ft (13 m) long with a longest span of 40 ft (12.2 m) and a deck 39 ft wide.

Who owns Lrd Davidson Road over Poplar Creek?

It is owned by the Town or Township Highway Agency.