Lrd Woodford DR over Rails to Trails Trail
PoorPosted for loadWashington County, Wisconsin · 0.3M E JCT Ush 45 · Structure no. P66006200000000
- Built
- 1910
- 115 years old
- Condition
- Poor
- inspected September 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 105 ft
- 1 main span
- Daily traffic
- 47
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Woodford DR over Rails to Trails Trail is a steel girder and floorbeam system carrying Lrd Woodford DR over Rails to Trails Trail in Washington County, Wisconsin. It was built in 1910, so it is 115 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 47 vehicles a day, projected to reach 51 by 2043. The structure is 105 ft (32 m) long and 14 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Woodford DR over Rails to Trails Trail built?
It was built in 1910, making it 115 years old in 2025.
What condition is Lrd Woodford DR over Rails to Trails Trail in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.
How much traffic does Lrd Woodford DR over Rails to Trails Trail carry?
About 47 vehicles per day (2024 count).
How long is Lrd Woodford DR over Rails to Trails Trail?
The structure is 105 ft (32 m) long with a longest span of 34 ft (10.5 m) and a deck 14 ft wide.
Who owns Lrd Woodford DR over Rails to Trails Trail?
It is owned by the Town or Township Highway Agency.