US Bridges

Lrd Salt Box RD over Little Turtle Creek

Fair

Walworth County, Wisconsin · 0.4M N JCT Stateline RD · Structure no. P64092500000000

Built
1960
65 years old
Condition
Fair
inspected January 2025
Type
Culvert
Other
Length
22 ft
3 main spans
Daily traffic
75
2025 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Salt Box RD over Little Turtle Creek is a other culvert carrying Lrd Salt Box RD over Little Turtle Creek in Walworth County, Wisconsin. It was built in 1960, so it is 65 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 75 vehicles a day, projected to reach 90 by 2045. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd Salt Box RD
CrossesLittle Turtle Creek
Location0.4M N JCT Stateline RD
RouteCity Street 0
Coordinates42.49801, -88.74715
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialOther
DeckNot applicable
Main spans3
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span0 ft (0 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2025)
Projected traffic90 by 2045
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Salt Box RD over Little Turtle Creek built?

It was built in 1960, making it 65 years old in 2025.

What condition is Lrd Salt Box RD over Little Turtle Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Lrd Salt Box RD over Little Turtle Creek carry?

About 75 vehicles per day (2025 count).

How long is Lrd Salt Box RD over Little Turtle Creek?

The structure is 22 ft (6.7 m) long.

Who owns Lrd Salt Box RD over Little Turtle Creek?

It is owned by the Town or Township Highway Agency.