US Bridges

Lrd N Terrace ST over Turtle Creek

Good

Walworth County, Wisconsin · 0.3M N JCT Sth 11 · Structure no. B64021300000000

Built
2024
1 years old
Condition
Good
inspected December 2024
Type
Slab
Concrete
Length
31 ft
1 main span
Daily traffic
1,100
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd N Terrace ST over Turtle Creek is a concrete slab carrying Lrd N Terrace ST over Turtle Creek in Walworth County, Wisconsin. It was built in 2024, so it is 1 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,100 vehicles a day, roughly 5% of them trucks, projected to reach 1,480 by 2044. The structure is 31 ft (9.4 m) long and 54 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd N Terrace ST
CrossesTurtle Creek
Location0.3M N JCT Sth 11
RouteCity Street 0
Coordinates42.63724, -88.64994
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.2 US tons
Inventory rating40.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length31 ft (9.4 m)
Longest span29 ft (8.7 m)
Deck width54 ft (16.5 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,100 (2024)
Projected traffic1,480 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd N Terrace ST over Turtle Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Lrd N Terrace ST over Turtle Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Lrd N Terrace ST over Turtle Creek carry?

About 1,100 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Lrd N Terrace ST over Turtle Creek?

The structure is 31 ft (9.4 m) long with a longest span of 29 ft (8.7 m) and a deck 54 ft wide.

Who owns Lrd N Terrace ST over Turtle Creek?

It is owned by the City or Municipal Highway Agency.