US Bridges

Lrd South Lake Sho over Trib Lake Geneva

Good

Walworth County, Wisconsin · 0.5M E JCT Sth 67 · Structure no. B64019400000000

Built
2016
9 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
48 ft
1 main span
Daily traffic
5,200
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd South Lake Sho over Trib Lake Geneva is a prestressed concrete stringer/multi-beam or girder carrying Lrd South Lake Sho over Trib Lake Geneva in Walworth County, Wisconsin. It was built in 2016, so it is 9 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,200 vehicles a day, projected to reach 6,240 by 2042. The structure is 48 ft (14.6 m) long and 52 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesLrd South Lake Sho
CrossesTrib Lake Geneva
Location0.5M E JCT Sth 67
RouteCity Street 0
Coordinates42.54584, -88.57079
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.2 US tons
Inventory rating44.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length48 ft (14.6 m)
Longest span44 ft (13.5 m)
Deck width52 ft (15.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,200 (2022)
Projected traffic6,240 by 2042
Trucks0%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd South Lake Sho over Trib Lake Geneva built?

It was built in 2016, making it 9 years old in 2025.

What condition is Lrd South Lake Sho over Trib Lake Geneva in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Lrd South Lake Sho over Trib Lake Geneva carry?

About 5,200 vehicles per day (2022 count).

How long is Lrd South Lake Sho over Trib Lake Geneva?

The structure is 48 ft (14.6 m) long with a longest span of 44 ft (13.5 m) and a deck 52 ft wide.

Who owns Lrd South Lake Sho over Trib Lake Geneva?

It is owned by the City or Municipal Highway Agency.