US Bridges

Lrd Cut- Off RD over Warner Creek

Good

Vernon County, Wisconsin · 0.1M S JCT Cth P · Structure no. B62022700000000

Built
2005
20 years old
Condition
Good
inspected May 2024
Type
Slab
Concrete
Length
38 ft
1 main span
Daily traffic
26
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Cut- Off RD over Warner Creek is a concrete slab carrying Lrd Cut- Off RD over Warner Creek in Vernon County, Wisconsin. It was built in 2005, so it is 20 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26 vehicles a day, roughly 12% of them trucks, projected to reach 28 by 2043. The structure is 38 ft (11.7 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd Cut- Off RD
CrossesWarner Creek
Location0.1M S JCT Cth P
RouteCity Street 0
Coordinates43.64606, -90.58617
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating86.4 US tons
Inventory rating51.8 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length38 ft (11.7 m)
Longest span36 ft (11 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26 (2022)
Projected traffic28 by 2043
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Cut- Off RD over Warner Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is Lrd Cut- Off RD over Warner Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Lrd Cut- Off RD over Warner Creek carry?

About 26 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is Lrd Cut- Off RD over Warner Creek?

The structure is 38 ft (11.7 m) long with a longest span of 36 ft (11 m) and a deck 26 ft wide.

Who owns Lrd Cut- Off RD over Warner Creek?

It is owned by the Town or Township Highway Agency.