US Bridges

Sth 35 over Genoa Creek

Good

Vernon County, Wisconsin · 2.5M N JCT Sth 56 · Structure no. B62012500000000

Built
2020
5 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
145 ft
3 main spans
Daily traffic
5,000
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 35 over Genoa Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 35 over Genoa Creek in Vernon County, Wisconsin. It was built in 2020, so it is 5 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, projected to reach 6,000 by 2040. The structure is 145 ft (44.3 m) long and 47 ft wide. If it were closed, the detour would be 34.8 mi (56 km).

CarriesSth 35
CrossesGenoa Creek
Location2.5M N JCT Sth 56
RouteState Highway 35
Coordinates43.57694, -91.22733
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating37.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length145 ft (44.3 m)
Longest span57 ft (17.4 m)
Deck width47 ft (14.2 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2022)
Projected traffic6,000 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed34.8 mi (56 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 35 over Genoa Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is Sth 35 over Genoa Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Sth 35 over Genoa Creek carry?

About 5,000 vehicles per day (2022 count).

How long is Sth 35 over Genoa Creek?

The structure is 145 ft (44.3 m) long with a longest span of 57 ft (17.4 m) and a deck 47 ft wide.

Who owns Sth 35 over Genoa Creek?

It is owned by the State Highway Agency.