Lrd Pierzina Lane over North Creek
FairTrempealeau County, Wisconsin · 2.3M N JCT Sth 95 · Structure no. P61090500000000
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected April 2024
- Type
- Channel Beam
- Prestressed Concrete
- Length
- 64 ft
- 1 main span
- Daily traffic
- 20
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Pierzina Lane over North Creek is a prestressed concrete channel beam carrying Lrd Pierzina Lane over North Creek in Trempealeau County, Wisconsin. It was built in 1975, so it is 50 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20 vehicles a day, projected to reach 21 by 2043. The structure is 64 ft (19.5 m) long and 26 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Pierzina Lane over North Creek built?
It was built in 1975, making it 50 years old in 2025.
What condition is Lrd Pierzina Lane over North Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Lrd Pierzina Lane over North Creek carry?
About 20 vehicles per day (2022 count).
How long is Lrd Pierzina Lane over North Creek?
The structure is 64 ft (19.5 m) long with a longest span of 60 ft (18.3 m) and a deck 26 ft wide.
Who owns Lrd Pierzina Lane over North Creek?
It is owned by the Town or Township Highway Agency.