Sth 35 over Trempealeau River East C
GoodTrempealeau County, Wisconsin · 0.7M E JCT Cth P · Structure no. B61028500000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 493 ft
- 5 main spans
- Daily traffic
- 6,600
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 35 over Trempealeau River East C is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 35 over Trempealeau River East C in Trempealeau County, Wisconsin. It was built in 2022, so it is 3 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,600 vehicles a day, roughly 8% of them trucks, projected to reach 8,000 by 2041. The structure is 493 ft (150.3 m) long and 47 ft wide. If it were closed, the detour would be 48.5 mi (78 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 35 over Trempealeau River East C built?
It was built in 2022, making it 3 years old in 2025.
What condition is Sth 35 over Trempealeau River East C in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Sth 35 over Trempealeau River East C carry?
About 6,600 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is Sth 35 over Trempealeau River East C?
The structure is 493 ft (150.3 m) long with a longest span of 110 ft (33.5 m) and a deck 47 ft wide.
Who owns Sth 35 over Trempealeau River East C?
It is owned by the State Highway Agency.