Sth 64-BROADWAY Av over Black River
FairTaylor County, Wisconsin · 1.4M E JCT Cth Q · Structure no. B60092200000000
- Built
- 1935
- 90 years old, rebuilt 1987
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 64 ft
- 1 main span
- Daily traffic
- 6,700
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Sth 64-BROADWAY Av over Black River is a steel stringer/multi-beam or girder carrying Sth 64-BROADWAY Av over Black River in Taylor County, Wisconsin. It was built in 1935 and reconstructed in 1987, so it is 90 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,700 vehicles a day, roughly 4% of them trucks, projected to reach 12,358 by 2043. The structure is 64 ft (19.4 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 64-BROADWAY Av over Black River built?
It was built in 1935, making it 90 years old in 2025. It was reconstructed in 1987.
What condition is Sth 64-BROADWAY Av over Black River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Sth 64-BROADWAY Av over Black River carry?
About 6,700 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Sth 64-BROADWAY Av over Black River?
The structure is 64 ft (19.4 m) long with a longest span of 62 ft (18.9 m) and a deck 39 ft wide.
Who owns Sth 64-BROADWAY Av over Black River?
It is owned by the City or Municipal Highway Agency.