US Bridges

Cth F over N Fk Eau Claire River

Good

Taylor County, Wisconsin · 5.8M E JCT Sth 73 · Structure no. B60015500000000

Built
2024
1 years old
Condition
Good
inspected November 2024
Type
Slab
Concrete
Length
43 ft
1 main span
Daily traffic
267
2024 count
Owner
County
County Highway Agency

About this bridge

Cth F over N Fk Eau Claire River is a concrete slab carrying Cth F over N Fk Eau Claire River in Taylor County, Wisconsin. It was built in 2024, so it is 1 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 267 vehicles a day, roughly 10% of them trucks, projected to reach 293 by 2044. The structure is 43 ft (13 m) long and 32 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCth F
CrossesN Fk Eau Claire River
Location5.8M E JCT Sth 73
RouteCounty Highway 0F
Coordinates45.08926, -90.70411
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.8 US tons
Inventory rating37.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length43 ft (13 m)
Longest span40 ft (12.2 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic267 (2024)
Projected traffic293 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth F over N Fk Eau Claire River built?

It was built in 2024, making it 1 years old in 2025.

What condition is Cth F over N Fk Eau Claire River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Cth F over N Fk Eau Claire River carry?

About 267 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Cth F over N Fk Eau Claire River?

The structure is 43 ft (13 m) long with a longest span of 40 ft (12.2 m) and a deck 32 ft wide.

Who owns Cth F over N Fk Eau Claire River?

It is owned by the County Highway Agency.