Sth 42 (calumet DR over Pigeon River
FairSheboygan County, Wisconsin · 1.0M N JCT Cth Ab · Structure no. B59014500000000
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 170 ft
- 2 main spans
- Daily traffic
- 14,300
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Sth 42 (calumet DR over Pigeon River is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 42 (calumet DR over Pigeon River in Sheboygan County, Wisconsin. It was built in 1993, so it is 32 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,300 vehicles a day, roughly 3% of them trucks, projected to reach 17,160 by 2041. The structure is 170 ft (51.7 m) long and 89 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 42 (calumet DR over Pigeon River built?
It was built in 1993, making it 32 years old in 2025.
What condition is Sth 42 (calumet DR over Pigeon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Sth 42 (calumet DR over Pigeon River carry?
About 14,300 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is Sth 42 (calumet DR over Pigeon River?
The structure is 170 ft (51.7 m) long with a longest span of 83 ft (25.3 m) and a deck 89 ft wide.
Who owns Sth 42 (calumet DR over Pigeon River?
It is owned by the City or Municipal Highway Agency.