US Bridges

Cth Ta Taylor Dri over Cnw RR

Good

Sheboygan County, Wisconsin · 0.3M N JCT Cth Pp · Structure no. B59011600000000

Built
1985
40 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
150 ft
3 main spans
Daily traffic
7,250
2021 count
Owner
County
County Highway Agency

About this bridge

Cth Ta Taylor Dri over Cnw RR is a prestressed concrete continuous stringer/multi-beam or girder carrying Cth Ta Taylor Dri over Cnw RR in Sheboygan County, Wisconsin. It was built in 1985, so it is 40 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,250 vehicles a day, projected to reach 8,700 by 2041. The structure is 150 ft (45.6 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCth Ta Taylor Dri
CrossesCnw RR
Location0.3M N JCT Cth Pp
RouteCounty Highway 0TA
Coordinates43.74297, -87.74376
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.8 US tons
Inventory rating37.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length150 ft (45.6 m)
Longest span53 ft (16.3 m)
Deck width36 ft (11.1 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,250 (2021)
Projected traffic8,700 by 2041
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.2 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cth Ta Taylor Dri over Cnw RR built?

It was built in 1985, making it 40 years old in 2025.

What condition is Cth Ta Taylor Dri over Cnw RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Cth Ta Taylor Dri over Cnw RR carry?

About 7,250 vehicles per day (2021 count).

How long is Cth Ta Taylor Dri over Cnw RR?

The structure is 150 ft (45.6 m) long with a longest span of 53 ft (16.3 m) and a deck 36 ft wide.

Who owns Cth Ta Taylor Dri over Cnw RR?

It is owned by the County Highway Agency.