Sth 23 Eb-Kohler D over Lrd Taylor DR
FairSheboygan County, Wisconsin · 1.8M E JCT IH 43 to S · Structure no. B59010300000000
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 162 ft
- 2 main spans
- Daily traffic
- 16,400
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 23 Eb-Kohler D over Lrd Taylor DR is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 23 Eb-Kohler D over Lrd Taylor DR in Sheboygan County, Wisconsin. It was built in 1979, so it is 46 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,400 vehicles a day, roughly 12% of them trucks, projected to reach 28,250 by 2043. The structure is 162 ft (49.3 m) long and 41 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 23 Eb-Kohler D over Lrd Taylor DR built?
It was built in 1979, making it 46 years old in 2025.
What condition is Sth 23 Eb-Kohler D over Lrd Taylor DR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Sth 23 Eb-Kohler D over Lrd Taylor DR carry?
About 16,400 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is Sth 23 Eb-Kohler D over Lrd Taylor DR?
The structure is 162 ft (49.3 m) long with a longest span of 81 ft (24.8 m) and a deck 41 ft wide.
Who owns Sth 23 Eb-Kohler D over Lrd Taylor DR?
It is owned by the State Highway Agency.