Lrd South Highline over Sth 29
FairShawano County, Wisconsin · 1 MI E of Sth 47 South · Structure no. B58006300000000
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 247 ft
- 2 main spans
- Daily traffic
- 510
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Lrd South Highline over Sth 29 is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd South Highline over Sth 29 in Shawano County, Wisconsin. It was built in 1996, so it is 29 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 510 vehicles a day, roughly 8% of them trucks, projected to reach 16,110 by 2043. The structure is 247 ft (75.3 m) long and 28 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd South Highline over Sth 29 built?
It was built in 1996, making it 29 years old in 2025.
What condition is Lrd South Highline over Sth 29 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Lrd South Highline over Sth 29 carry?
About 510 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Lrd South Highline over Sth 29?
The structure is 247 ft (75.3 m) long with a longest span of 124 ft (37.8 m) and a deck 28 ft wide.
Who owns Lrd South Highline over Sth 29?
It is owned by the State Highway Agency.