Lrd Weirgor RD over Courderay River
GoodSawyer County, Wisconsin · 0.3M S JCT Sth 27 · Structure no. B57006800000000
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected August 2024
- Type
- Slab
- Concrete Continuous
- Length
- 80 ft
- 2 main spans
- Daily traffic
- 51
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Weirgor RD over Courderay River is a concrete continuous slab carrying Lrd Weirgor RD over Courderay River in Sawyer County, Wisconsin. It was built in 2003, so it is 22 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 51 vehicles a day, roughly 5% of them trucks, projected to reach 46 by 2043. The structure is 80 ft (24.4 m) long and 26 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Weirgor RD over Courderay River built?
It was built in 2003, making it 22 years old in 2025.
What condition is Lrd Weirgor RD over Courderay River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Lrd Weirgor RD over Courderay River carry?
About 51 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Lrd Weirgor RD over Courderay River?
The structure is 80 ft (24.4 m) long with a longest span of 38 ft (11.6 m) and a deck 26 ft wide.
Who owns Lrd Weirgor RD over Courderay River?
It is owned by the Town or Township Highway Agency.