Sth 58-CENTER ST over Baraboo River
FairSauk County, Wisconsin · 4.2M N JCT Cth G to E · Structure no. B56079600000000
- Built
- 1941
- 84 years old, rebuilt 1990
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 120 ft
- 2 main spans
- Daily traffic
- 1,400
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 58-CENTER ST over Baraboo River is a steel stringer/multi-beam or girder carrying Sth 58-CENTER ST over Baraboo River in Sauk County, Wisconsin. It was built in 1941 and reconstructed in 1990, so it is 84 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,400 vehicles a day, roughly 9% of them trucks, projected to reach 1,680 by 2041. The structure is 120 ft (36.6 m) long and 38 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 58-CENTER ST over Baraboo River built?
It was built in 1941, making it 84 years old in 2025. It was reconstructed in 1990.
What condition is Sth 58-CENTER ST over Baraboo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Sth 58-CENTER ST over Baraboo River carry?
About 1,400 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is Sth 58-CENTER ST over Baraboo River?
The structure is 120 ft (36.6 m) long with a longest span of 57 ft (17.5 m) and a deck 38 ft wide.
Who owns Sth 58-CENTER ST over Baraboo River?
It is owned by the State Highway Agency.