US Bridges

Lrd 250th Street over Br Carr Creek

Good

St. Croix County, Wisconsin · 0.4M S JCT Cth Bb · Structure no. B55011200000000

Built
1990
35 years old
Condition
Good
inspected November 2024
Type
Slab
Concrete Continuous
Length
50 ft
2 main spans
Daily traffic
61
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd 250th Street over Br Carr Creek is a concrete continuous slab carrying Lrd 250th Street over Br Carr Creek in St. Croix County, Wisconsin. It was built in 1990, so it is 35 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 61 vehicles a day, projected to reach 67 by 2043. The structure is 50 ft (15.2 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd 250th Street
CrossesBr Carr Creek
Location0.4M S JCT Cth Bb
RouteCity Street 0
Coordinates44.94511, -92.29836
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.5 US tons
Inventory rating41.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length50 ft (15.2 m)
Longest span24 ft (7.3 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic61 (2022)
Projected traffic67 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd 250th Street over Br Carr Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is Lrd 250th Street over Br Carr Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Lrd 250th Street over Br Carr Creek carry?

About 61 vehicles per day (2022 count).

How long is Lrd 250th Street over Br Carr Creek?

The structure is 50 ft (15.2 m) long with a longest span of 24 ft (7.3 m) and a deck 26 ft wide.

Who owns Lrd 250th Street over Br Carr Creek?

It is owned by the Town or Township Highway Agency.