US Bridges

Lrd Reichel Road over Weirgor Creek

Good

Rusk County, Wisconsin · 2.5M N JCT Cth H-96 · Structure no. P54007000000000

Built
1984
41 years old
Condition
Good
inspected October 2024
Type
Arch - Deck
Aluminum, Wrought Iron, or Cast Iron
Length
39 ft
1 main span
Daily traffic
49
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Reichel Road over Weirgor Creek is a aluminum, wrought iron, or cast iron arch - deck carrying Lrd Reichel Road over Weirgor Creek in Rusk County, Wisconsin. It was built in 1984, so it is 41 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49 vehicles a day, projected to reach 51 by 2043. The structure is 39 ft (12 m) long and 40 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesLrd Reichel Road
CrossesWeirgor Creek
Location2.5M N JCT Cth H-96
RouteCity Street 0
Coordinates45.61619, -91.257
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating26.8 US tons

Structure

Structure typeArch - Deck
MaterialAluminum, Wrought Iron, or Cast Iron
DeckAluminum
Main spans1
Design loadH 20
Structure length39 ft (12 m)
Longest span38 ft (11.5 m)
Deck width40 ft (12.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49 (2024)
Projected traffic51 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Reichel Road over Weirgor Creek built?

It was built in 1984, making it 41 years old in 2025.

What condition is Lrd Reichel Road over Weirgor Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Lrd Reichel Road over Weirgor Creek carry?

About 49 vehicles per day (2024 count).

How long is Lrd Reichel Road over Weirgor Creek?

The structure is 39 ft (12 m) long with a longest span of 38 ft (11.5 m) and a deck 40 ft wide.

Who owns Lrd Reichel Road over Weirgor Creek?

It is owned by the Town or Township Highway Agency.