US Bridges

Sth 73 over Alder Creek

Good

Rusk County, Wisconsin · 1.9M N JCT Sth 194 · Structure no. B54013300000000

Built
2020
5 years old
Condition
Good
inspected June 2022
Type
Slab
Concrete
Length
34 ft
1 main span
Daily traffic
460
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 73 over Alder Creek is a concrete slab carrying Sth 73 over Alder Creek in Rusk County, Wisconsin. It was built in 2020, so it is 5 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 460 vehicles a day, roughly 11% of them trucks, projected to reach 500 by 2040. The structure is 34 ft (10.5 m) long and 38 ft wide. If it were closed, the detour would be 53.4 mi (86 km).

CarriesSth 73
CrossesAlder Creek
Location1.9M N JCT Sth 194
RouteState Highway 73
Coordinates45.37893, -90.82278
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.8 US tons
Inventory rating51.5 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length34 ft (10.5 m)
Longest span32 ft (9.8 m)
Deck width38 ft (11.7 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic460 (2022)
Projected traffic500 by 2040
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed53.4 mi (86 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 73 over Alder Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is Sth 73 over Alder Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does Sth 73 over Alder Creek carry?

About 460 vehicles per day (2022 count), of which roughly 11% are trucks.

How long is Sth 73 over Alder Creek?

The structure is 34 ft (10.5 m) long with a longest span of 32 ft (9.8 m) and a deck 38 ft wide.

Who owns Sth 73 over Alder Creek?

It is owned by the State Highway Agency.