Lrd Pioneer RD over Skinner Creek
FairRusk County, Wisconsin · 1.2M E JCT Cth M-102 · Structure no. B54008200000000
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected August 2024
- Type
- Slab
- Concrete
- Length
- 49 ft
- 1 main span
- Daily traffic
- 63
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Pioneer RD over Skinner Creek is a concrete slab carrying Lrd Pioneer RD over Skinner Creek in Rusk County, Wisconsin. It was built in 1999, so it is 26 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 63 vehicles a day, projected to reach 59 by 2043. The structure is 49 ft (14.8 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Pioneer RD over Skinner Creek built?
It was built in 1999, making it 26 years old in 2025.
What condition is Lrd Pioneer RD over Skinner Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Lrd Pioneer RD over Skinner Creek carry?
About 63 vehicles per day (2024 count).
How long is Lrd Pioneer RD over Skinner Creek?
The structure is 49 ft (14.8 m) long with a longest span of 46 ft (14 m) and a deck 26 ft wide.
Who owns Lrd Pioneer RD over Skinner Creek?
It is owned by the Town or Township Highway Agency.