Ush 8-ARTHUR ST over Chippewa River 22
FairRusk County, Wisconsin · 0.7M E JCT Sth 40 · Structure no. B54006400000000
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 364 ft
- 4 main spans
- Daily traffic
- 3,800
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Ush 8-ARTHUR ST over Chippewa River 22 is a prestressed concrete continuous stringer/multi-beam or girder carrying Ush 8-ARTHUR ST over Chippewa River 22 in Rusk County, Wisconsin. It was built in 1996, so it is 29 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,800 vehicles a day, roughly 9% of them trucks, projected to reach 8,784 by 2043. The structure is 364 ft (110.9 m) long and 47 ft wide. If it were closed, the detour would be 48.5 mi (78 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ush 8-ARTHUR ST over Chippewa River 22 built?
It was built in 1996, making it 29 years old in 2025.
What condition is Ush 8-ARTHUR ST over Chippewa River 22 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Ush 8-ARTHUR ST over Chippewa River 22 carry?
About 3,800 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is Ush 8-ARTHUR ST over Chippewa River 22?
The structure is 364 ft (110.9 m) long with a longest span of 90 ft (27.4 m) and a deck 47 ft wide.
Who owns Ush 8-ARTHUR ST over Chippewa River 22?
It is owned by the State Highway Agency.