Ush 8-LAWRENCE ST over Deer Tail Creek
FairRusk County, Wisconsin · 0.1M E JCT Cth I to N · Structure no. B54001100000000
- Built
- 1961
- 64 years old, rebuilt 1990
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 49 ft
- 1 main span
- Daily traffic
- 2,600
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Ush 8-LAWRENCE ST over Deer Tail Creek is a steel stringer/multi-beam or girder carrying Ush 8-LAWRENCE ST over Deer Tail Creek in Rusk County, Wisconsin. It was built in 1961 and reconstructed in 1990, so it is 64 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,600 vehicles a day, roughly 10% of them trucks, projected to reach 3,120 by 2041. The structure is 49 ft (14.9 m) long and 47 ft wide. If it were closed, the detour would be 53.4 mi (86 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ush 8-LAWRENCE ST over Deer Tail Creek built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1990.
What condition is Ush 8-LAWRENCE ST over Deer Tail Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Ush 8-LAWRENCE ST over Deer Tail Creek carry?
About 2,600 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Ush 8-LAWRENCE ST over Deer Tail Creek?
The structure is 49 ft (14.9 m) long with a longest span of 49 ft (14.9 m) and a deck 47 ft wide.
Who owns Ush 8-LAWRENCE ST over Deer Tail Creek?
It is owned by the State Highway Agency.