IH 43 NB over Cp Railroad and Spring B
GoodRock County, Wisconsin · 0.5 MI S JCT Sth 81 · Structure no. B53030800000000
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 242 ft
- 2 main spans
- Daily traffic
- 8,350
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH 43 NB over Cp Railroad and Spring B is a prestressed concrete continuous stringer/multi-beam or girder carrying IH 43 NB over Cp Railroad and Spring B in Rock County, Wisconsin. It was built in 2020, so it is 5 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,350 vehicles a day, roughly 19% of them trucks, projected to reach 9,450 by 2044. The structure is 242 ft (73.9 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 43 NB over Cp Railroad and Spring B built?
It was built in 2020, making it 5 years old in 2025.
What condition is IH 43 NB over Cp Railroad and Spring B in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does IH 43 NB over Cp Railroad and Spring B carry?
About 8,350 vehicles per day (2022 count), of which roughly 19% are trucks.
How long is IH 43 NB over Cp Railroad and Spring B?
The structure is 242 ft (73.9 m) long with a longest span of 118 ft (36.1 m) and a deck 36 ft wide.
Who owns IH 43 NB over Cp Railroad and Spring B?
It is owned by the State Highway Agency.