Lrd Colley RD over Turtle Creek
FairRock County, Wisconsin · 0.5M E JCT Milwaukee RD · Structure no. B53013400000000
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected September 2024
- Type
- Slab
- Concrete Continuous
- Length
- 86 ft
- 2 main spans
- Daily traffic
- 1,283
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Colley RD over Turtle Creek is a concrete continuous slab carrying Lrd Colley RD over Turtle Creek in Rock County, Wisconsin. It was built in 1983, so it is 42 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,283 vehicles a day, projected to reach 1,409 by 2043. The structure is 86 ft (26.2 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Colley RD over Turtle Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is Lrd Colley RD over Turtle Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Lrd Colley RD over Turtle Creek carry?
About 1,283 vehicles per day (2024 count).
How long is Lrd Colley RD over Turtle Creek?
The structure is 86 ft (26.2 m) long with a longest span of 42 ft (12.8 m) and a deck 37 ft wide.
Who owns Lrd Colley RD over Turtle Creek?
It is owned by the Town or Township Highway Agency.