US Bridges

Sth 80 over Pine River

Good

Richland County, Wisconsin · 0.1M N JCT Cth D to E · Structure no. B52027000000000

Built
2018
7 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
275 ft
3 main spans
Daily traffic
1,900
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 80 over Pine River is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 80 over Pine River in Richland County, Wisconsin. It was built in 2018, so it is 7 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,900 vehicles a day, projected to reach 2,280 by 2042. The structure is 275 ft (83.9 m) long and 39 ft wide. If it were closed, the detour would be 26.7 mi (43 km).

CarriesSth 80
CrossesPine River
Location0.1M N JCT Cth D to E
RouteState Highway 80
Coordinates43.42135, -90.36158
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.4 US tons
Inventory rating38.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length275 ft (83.9 m)
Longest span93 ft (28.4 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,900 (2022)
Projected traffic2,280 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed26.7 mi (43 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 80 over Pine River built?

It was built in 2018, making it 7 years old in 2025.

What condition is Sth 80 over Pine River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Sth 80 over Pine River carry?

About 1,900 vehicles per day (2022 count).

How long is Sth 80 over Pine River?

The structure is 275 ft (83.9 m) long with a longest span of 93 ft (28.4 m) and a deck 39 ft wide.

Who owns Sth 80 over Pine River?

It is owned by the State Highway Agency.